timeline
timeline
A Gantt-style timeline canvas — drag events to reschedule, drag edges to resize, drag vertically to link as parent/child. The scheduling engine supports auto-bounds parents, constraint-aware fit/trim, and recurring series with shadow echoes.
A 9-step pipeline with dependency arrows. Drag to reschedule (parents move subtrees), scroll to pan, Cmd+scroll to zoom.
Installation
Usage
Timeline: Root · Canvas · Minimap · Inspector · Legend
Use when
- Project pipeline visualization with dependency arrows and lane packing
- Constraint-aware scheduling — fit a template into a slot, detect conflicts, derive parent bounds from children
- Recurring events with occurrence overrides and shadow capping
A migration overrunning its fixed parent window. Click ⤢ fit to compress it back inside.
A migration overrunning its fixed parent window. Click ⤢ fit to compress it back inside.
Campaign window derived from 3 phases (dashed = computed). Drag a phase's edge — a ghost previews the parent's new bounds.
Campaign window derived from 3 phases (dashed = computed). Drag a phase's edge — a ghost previews the parent's new bounds.
A 7-day sale template fitting into a Black Friday slot. Fit to 72h succeeds; Fit to 48h fails with deficit + blockers.
A 7-day sale template fitting into a Black Friday slot. Fit to 72h succeeds; Fit to 48h fails with deficit + blockers.
Weekly tournament with shadow echoes. Drag the focused bar to move the series; the 3rd occurrence is pre-cancelled (slashed outline).
Daily standup, 40 occurrences — shadows cap at 24; the rest collapse into the chip.
Weekly tournament with shadow echoes. Drag the focused bar to move the series; the 3rd occurrence is pre-cancelled (slashed outline).